This refurbishment in the heart of the London docklands saw the team refurbish an existing 7 storey office development. The shell and core project which was electrically driven, saw the existing space being converted into a data centre hub. Mechanically, Munro also installed cold water booster sets, some sump pumps and a dry riser.