Working on behalf of Coniston for Shepherd Construction, we were contracted to upgrade the water supply as part of the overall refurbishment at the site.
The existing piped domestic mains water to the Teal, Ibis and Wren Block were both unreliable and in need of replacing. To overcome this we provided a separate new piped mains cold water supply for domestic use in the workshops, kitchen, reception and administration areas. In addition, we installed a supply of tanked and pumped water for firefighting purposes to hose reels.